The following work is being completed on the Burnt Cedar Beach Flatwork project: 

  • Removed old railroad tie edging and replaced with aesthetic block seat walls
  • Moved bear boxes out of sight lines
  • Reestablished designated pedestrian pathways and hardened with block pavers.
  • Improvements are designed to capture migrating beach.