The vertical pivot gate will operate in all weather conditions. Installation of the gate is required in order for the District to be in compliance with AWIA 2018 safety and security protocols for water and sewer infrastructure.

IVGID Engineering staff prepared bid documents and solicited proposals from six (6) local gate contractors for the project. The construction project was awarded to Sierra Gate & Control. Anticipated completion of construction end of March 2021, weather permitted.

Main Electrical Breaker Replacement, 2599SS1102

This work will replace the main electrical breaker at the District’s Water Resource Recovery Facility. Requests for Proposals were sent out to six local electrical contractors on December 17, 2021. A mandatory job site walk will take place on January 4, and proposals are due by January 25, 2022. We anticipate this work to be complete by April 6, 2022.