Incline Beach House Project
What is the Incline Beach House Project?
The Incline Beach House Project has a history dating back to 2016 and has undergone multiple planning iterations since its inception. As one of the largest capital improvement projects at the Incline Village beaches in many years, the Incline Beach House Project (project # 3973LI1302) will involve the tear down and rebuilding of the Incline Beach restrooms and food service building.
Where is the project at in the planning/design/construction process?
Oct. 7, 2025 update: IVGID’s Engineering Team opened bidding for the construction phase of the project on October 2, with bidding closing on October 23. The hope is to choose a construction firm and get through the Guaranteed Maximum Price (GMP) negotiations in time to return to the Board of Trustees with a GMP for the project as currently scoped on December 10, 2025.
Permits for the project were submitted to the TRPA on September 19. At the IVGID Board of Trustee’s September 17 meeting, the Trustees reaffirmed their support for a select list of added alternates to the project. Please view the linked documents below for details on planned construction areas, areas of Incline Beach which will be open for public use and parking during the construction, and the locations of the added alternates.
- Click to view the Sept. 17 Incline Beach House Board memorandum
- Click to view the Sept. 17 Incline Beach House presentation to the Board
- Click to review the video recording of the Sept. 17 Incline Beach House discussion by the Board

June 24, 2025 update: The Design-Build Team at CORE Construction has submitted Design Development Drawings (linked below) and will now proceed with Construction Drawings, which are scheduled for submission at the end of August.
- Click to view Incline Beach House Project Architectural Design Development Drawings (PDF)
- Click to view Incline Beach House Materials Study (PDF)
Draft renderings


On January 29, 2025: IVGID’s Public Works staff presented a comprehensive overview of the history of the Incline Beach House Project to the IVGID Board of Trustees. Click here to download the memo (PDF).
In January 2022: The IVGID Board of Trustees identified the Incline Beach House Project in the Community Services Master Plan as a “priority project” and “top tier recommendation.”
How can I provide my feedback on the project as currently proposed?
Please utilize the Beach House Public Comment form below to share your thoughts on the project. All public comment will be forwarded to the Engineering team that is working to refine the project and will be summarized and presented to the IVGID Board of Trustees.